Used KRONES filling glass line for beer 34000 BPHTechnical
Specifications & Performance DataThis complete glass bottling line for
beer is a high-speed, second hand solution engineered by Krones for
industrial packaging and beverage production. Designed for crown cap
closures and glass bottle handling, the line delivers excellent
throughput and quality control across multiple formats. It is an ideal
used bottling line for breweries looking to increase capacity with
proven equipment.Production speed: up to 34,100 bphFormat performance:
34,100 bph for 0.33L, 0.355L, 0.45L; 30,000 bph for 0.5L,
0.75LCompatible formats: 0.33L, 0.355L, 0.45L, 0.5L, 0.75L
bottlesContainers: Glass bottlesClosure type: Crown capYear of
manufacture: 2017Recorded operating hours: 25,655Key equipment:
LAVATEC D4.CCD.EQ318 bottle washer; MODULFILL HES 2.880-104-87 filling
monoblock; LINAFLEX LB24.7-523-41 tunnel pasteurizer; SOLOMATIC
1.200-30 labeling machine; LINATRONIC M and CHECKMAT inspection
systems; SYNCO S/MULTICO S/PALCO S conveyingAdvanced Automation &
Control SystemsThe line integrates Krones inspection and control
technologies to ensure stable operation and consistent quality.
LINATRONIC empty bottle inspection and multiple CHECKMAT inspection
stations monitor critical points including fill level, label presence,
and crate quality. Network technology and IT hardware, together with
UPS and electrical distribution, support reliable automation. Fast
format transitions, centralized controls, and integrated cap feeding
optimize uptime and reduce changeover times.Production Line
Integration CapabilitiesEngineered as a fully integrated production
line, this system includes depalletizing, unpacking, crate washing,
bottle washing, rinsing/inspection, isobaric beer filling with crown
capping, pasteurization, drying, labeling, case packing, full-crate
inspection, and end-of-line palletizing. Comprehensive conveyor
systemsâSYNCO S for bottles, MULTICO S for crates, and PALCO S
for palletsâensure smooth material flow. The line handles
multiple beer bottle sizes from 0.33L to 0.75L, enabling multi-SKU
flexibility for beverage production.Machine Condition & Maintenance
HistoryThe line remains powered and can perform a dry run, making it
ready for operation upon installation. Operating hours are documented
at 25,655. Manuals and the complete layout are available, supporting
efficient planning, commissioning, and maintenance.Operational
Performance & VersatilityOptimized for beer in glass bottles, the
MODULFILL HES monoblock provides precise isobaric filling and reliable
crown capping at high speed. Upstream, the LAVATEC bottle washer and
LINATRONIC inspection protect product quality and packaging integrity.
Downstream, the LINAFLEX tunnel pasteurizer, LINADRY bottle dryer,
SOLOMATIC labeler, and CHECKMAT inspectors deliver consistent
presentation and compliance. Integrated crate handling (unpacker,
crate washer, magazine, full/empty crate inspection) and robust
end-of-line systems (SMARTPAC packer, PRESSANT palletizer) complete an
industrial packaging solution.Installation Requirements & Site
PreparationSite preparation should account for a high-speed glass
bottling layout with bottle, crate, and pallet conveyors. Utilities
typically include electrical power, compressed air, process water for
washing and pasteurization, and chemical supply for caustic systems.
Adequate floor space for the washer, pasteurizer tunnel, conveyors,
and pallet handling is recommended to maintain ergonomic access and
service corridors.Safety Standards & Compliance CertificationThe line
incorporates guarding, interlocks, and inspection systems to support
safe operation and quality assurance in beverage environments.
Stainless-steel process contact areas and hygienic design principles
are applied across critical equipment such as the filler, washer, and
pasteurizer, aligning with food and beverage industry standards.