We use cookies to optimize our website for you and to be able to continuously improve it. By continuing to browse the site you are agreeing to our use of cookies.
Disagree
used
used
used
used
Hammer drill, drilling machineHILTITE 54 ( TE54 )drilling capacity steel: 13 mmdrilling capacity concrete: 52 mm230 / 480 rpm900 W230 Vwith caseDimensions: 600 x 400 x 140 mm
used
Diamond Core Bit, Core Drill BitHILTIDD-BI 25/280 RC ( DD-BI25/280RC )250900 / 8Ø 25 mmDepth: 280 mmNew !Dimensions(Package): 350 x 40 x 40 mm
used
Diamond Core Bit, Core Drill BitHILTIDD-BI 10/190 ( DD-BI10/190 )B18/512672Ø 10 mmDepth: 190 mmNew !Dimensions(Package): 280 x 40 x 40 mm
used
Diamond Core Bit, Core Drill BitHILTIDD-BI 14/280 ( DD-BI14/280 )B10/510574Ø 14 mmDepth: 280 mmused !Dimensions(packaging): 400 x 40 x 40 mm
used
new
Cone splitter JSK-350-MS01, splitting cone, drill cone, log splitter, 1x hydraulic earth boring device HBG-1500 (for mini excavator, tractor, front loader), 1x adapter, quick coupler MS-01 (for HBG-1500 and HBG-2000), 1x Jansen splitting cone, 1x jansen fixation adapter splitting cone
used
used
ID3789 Nordmeyer Casing Machine, max. 273 mm, in working order Piping machine, max. 273 mm, functional
used
A stationary Hess concrete block step tilting mold machine is available. Production area X/Y: 750mm/1500mm, production height: 300mm, board dimensions X/Y/Z: 1700mm/550mm/300mm, board material: aluminum, number of boards: 290, vibration stations: 2, vibration station type: HFZ 2500, vibration force: 89.5kN, available mold types: block step chamfer/block step Ortenau/deep curb, control system: Siemens PLC. Including transport conveyor with 180° turning device and two lifting devices, lifting ladder, transfer car, lowering ladder, board discharge, board cleaning and board buffer. The compact external vibrators were converted to load vibrators. This is a complete system with peripheral and conveyor units. Documentation vorhanden. An on-site inspection is possible.
used
ID3770 Klemm KR806-3F year/Baujahr 2015 approx. 4.870 hours/hours 17.8 t Double-head drilling rig; the drive for the internal linkage/hydraulic hammer is a KD 1011 Double-head drilling rig, drive for the inner rod / hydraulic hammer is a KD 1011
used
ID3756 Furukawa HCR1200-ED II year/Baujahr 2011 2.680 hours/hours 14.7 t Blast hole drilling rig, 4900 engine hours, 2700 drilling hours Blast Hole Drilling Rig, 4900 Engine Hours, 2,700 Drilling Hours
used
ID3740 Botec-Scheitza drill mount for auger and down-the-hole hammer drilling (max. diameter 130 mm), without impact mechanism (rotary motor only), 20 m drill rod 110 mm (without drill head) Drilling rig for worm and down-the-hole hammer drilling (max. diameter 130 mm), without impact mechanism (rotary motor only), 20 m drill pipe 110 mm (without drill head)
used
Injection material blowing pressure: 0.5-6bar, Drive: variable gearbox Lenze, Elements: material hose, blow-out nozzle, directional valve, swivel lever, exhaust valve, valve, nozzle, pressure reducer, handwheel, slide gate, control cabinet, control switch, water hose, needle valve, nozzle mixing body. Overhauled by the manufacturer in 2014. With pressure vessel and documentation. An on-site inspection is possible.
used
ID3738 Witte Bohrtechnik VSB500-200 year/Baujahr 1991 Trailer-mounted well drilling rig, Hatz engine, 2 hydraulic pumps, direct rotary head, with flushing pump (auxiliary pump) – with Hatz engine, previously drilled to a depth of 60 m – 160/170 mm Trailer well drill, Hatz engine, 2 hydr. Pumps, direct rotary head, with mud pump (auxiliary pump) - with Hatz motor, drilled with it so far: 60 m depth - 160/170 mm
used
ID3737 Nordmeyer on Unimog Well drilling rig, Nordmeyer? on Unimog, single-stage pump, equipment overhauled in the last 3 years for approx. €40,000 (power swivel, hydraulic pumps, main gearbox for engine overhauled, new flushing pump), everything works, drilled with it so far: 100 m depth - 152 mm, 60 m depth - 325 mm Well drilling rig, Nordmeyer? on Unimog, single-stage pump, equipment overhauled the last 3 years for about 40,000 euros (power turntable, hydraulic pumps, main gearbox for engine overhauled, new mud pump), everything works, drilled with it so far: 100 m depth - 152 mm, 60 m depth - 325 mm
used
A stationary Putzmeister concrete pump in trailer design is available. Motor power: 7.5kW, max. delivery pressure: 40bar, delivery capacity range: 30l-90l/min, max. aggregate size: 8mm, piston stroke: 130mm, piston diameter: 100mm, mixing hopper volume: 170l, feed hopper volume: 200l, filling height: 1300mm. Machine dimensions X/Y/Z: approx. 3650mm/1600mm/1600mm, weight: approx. 1200kg. Documentation available. An on-site inspection is possible.
used
ID3701 Nordmeyer 3/14 year/Baujahr 2012 19.400 hours/hours Drilling rig, 219 mm head, up to 600 m drilling depth, jaws 344 Drilling rig, 219 mm head, up to 600 m drilling depth, jaws 344
used
ID3701 Nordmeyer 3/14 year/Baujahr 2012 19.400 hours/hours Drilling rig, 219 mm head, up to 600 m drilling depth, jaws 344 Drilling rig, 219 mm head, up to 600 m drilling depth, jaws 344
used
Scraper capacity 20m: 108m³/h, outreach: 20m, boom angle of attack: 15°, slewing radius: 2080mm, clearing bucket width: 1170mm, volume: 1050l, steep angle: 320°, max. tractive force: 62kN, max. load torque: 322kNm, connected load: 47kW. Machine dimensions X/Y/Z: approx. 3200mm/2150mm/2350mm, weight: approx. 4600kg. On-site inspection is possible.
used
ID3518 Bomag B200 on Iveco truck - Well drill / well drill year/Baujahr 1985 approx. 35,000 km Bomag B200 drilling rig (built in 1985), mounted on an Iveco truck (all-wheel drive), with a 100 mm rotary head and a 120 m cable, drilling depths of up to 245 m (250-300 mm diameter), 2 Caprari pumps (type MEC-100), with approximately 90 m of drill rods (114 mm diameter) Bomag B200 (built in 1985), on truck Iveco (all-wheel drive), rotary head 100 mm passage, rope head 120 m rope, drilled to 245 m depth - 250-300 mm diameter, 2 Caprari pumps (type MEC-100), with approx. 90 m drill pipe (114 mm diameter)
used
ID3420 Geotec Rotomax XL GTCi year/Baujahr 2012 approx. 10,000 hours/hours 15 t Crawler drilling rig, Flush drilling rig, double-head rig, drilling with protective casing, geothermal energy up to 250 m depth - diameter up to 180 mm, well drilling up to 100 m depth - up to 400 mm diameter, power 168 KW, with 150 m drill pipe (90 mm) and 30 m protective piping (178 mm) Crawler drilling rig, flush drilling rig, double-head rig, drilling with protective casing, geothermal energy up to 250 m depth - diameter up to 180 mm, well drilling up to 100 m depth - up to 400 mm diameter, power 168 KW, with 150 m drill pipe (90 mm) and 30 m protective casing (178 mm)
used
ID3354 Unimog - 4x4 year/Baujahr 1982 Unimog 4x4, Nordmeyer DSB 1 3/5 (combination drilling rig for dry and mud drilling), with piston pump with approx. 200 litres per minute for core drilling, with centrifugal pump for well drilling (supplied loose), two-stage power rotary head (450 daN - 175 revolutions/ 225daN - 350 revolutions), drilling diameter dry drilling max. 324mm, flush drilling max. 600mm in air-lift or suction flush drilling (additional equipment: drilling diameters up to 290mm are possible in rotary drilling), without casing machine Unimog 4x4, Nordmeyer DSB 1 3/5 (combination drilling rig for dry and flush drilling), with piston pump with approx. 200 l per minute for core drilling, with centrifugal pump for well drilling (loosely enclosed), power rotary head two-stage (450 daN - 175 revolutions/ 225daN - 350 revolutions), drilling diameter dry drilling max. 324mm, fl ...
used
ID3337 Wassara Drilling equipment / Bohrausrüstung Drilling equipment (Wassara W150 water hammer), new price of the entire equipment approx. 50,000 euros Drilling equipment, (Wassara W150 water hammer), original price of all equipment approx. 50,000 euros
used
ID3265 Adler B50 year/Year of construction 2020 approx. 1500 hours/ hours 3.1 t Well drilling rig (well construction and geothermal energy up to 100 m), with trailer for drilling rig up to 3.5 t, standpipe with auger for pre-drilling, 110 m flushing drill pipe on steel pallet, complete maintenance was carried out at the end of 23. The machine was fitted with a new drill head from Eurodrill at the end of 2013 for approx. 20,000 euros. Water well drilling rig (well construction and geothermal energy up to 100 m), with trailer for drilling rig up to 3.5t, standpipe with auger for pre-drilling, 110 m directional drill pipe on steel pallet, complete maintenance was carried out at the end of 23. At the end of 23, the machine received a new drill head from Eurodrill for about 20,000 euros.